Contract · Federal · Small Business Set Aside - Total
USCG Cutter Eagle New Dredging for Berthing at New London City Pier
- Agency
- HOMELAND SECURITY, DEPARTMENT OF / US COAST GUARD
- Location
- New London, CT
- Amount
- Amount not listed
- Posted
- Sep 11, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 23799 - Other Heavy and Civil Engineering Construction (general category) look up NAICS codes
- PSC code
- Z1KF - Maintenance, Repair, or Alteration of Real Property (general category)
Timeline
-
Posted
Sep 11, 2026
-
Status
Open now
What contracts like this typically pay
No award history yet for this category (NAICS 23799).
What this contract is for
- Agency
- HOMELAND SECURITY, DEPARTMENT OF / US COAST GUARD
- Location
- New London, CT
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 23799 - Other Heavy and Civil Engineering Construction (general category)
- Scope
- Federal
Eagle Pier New Dredging (FY26) at New London’s City Pier, CT (NEW LONDON COUNTY), PSN #24014900.
Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE’s berth at New London’s City Pier.
The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels.
Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ over dredging allowance.
This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site.
Offshore disposal is not permitted due to environmental sample analysis of the dredge area.
There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st.
SPECIAL NOTES: The contractor shall conduct dredging operations so that navigation through the channel is possible at all times.
The scope of work also includes removals of approximately 50 piles that remain below the waterline.
Any piles that cannot be fully removed are to be cut at -21.0’ MLLW.
Dredge quantity of 3,700 CY.
This estimate is based on an average of the past annual dredging and surveys.
The Contractor shall provide a cost for dredging per cubic yard.
That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 3,700 cubic yards, within the limits of dredge.
Contractor will be compensated for actual quantity of dredge material removed and disposed, within the limits of dredge, as shown on the plan sheets.
Dredge disposal site location is to be determined by conditions of treated/non-treated piles for Base bid item and Option Bid ite...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.