Contract · Federal
CP20-4 Structural Coatings
- Agency
- Not listed
- Location
- AIKEN, SC
- Amount
- Amount not listed
- Posted
- Apr 21, 2008
- Set-aside
- None (open competition)
- NAICS code
- 238320 - Painting and Wall Covering Contractors look up NAICS codes
- PSC code
- 80
Timeline
-
Posted
Apr 21, 2008
-
Status
Open now
What contracts like this typically pay
est. $22K-$194K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Location
- AIKEN, SC
- NAICS
- 238320 - Painting and Wall Covering Contractors
- Scope
- Federal
The MOX Fuel Fabrication Facility (MFFF) will produce completed Mixed Oxide (MOX) fuel assemblies for use in domestic, commercial nuclear power reactors.
Feed material is uranium dioxide and surplus plutonium dioxide.
The manufacturing area is the MOX Fuel Fabrication Building (BMF).
It is a multi-functional complex containing all of the plutonium handling, fuel processing, and fuel fabrication operations of the MFFF.
This Expression of Interest (EOI) is for the structural concrete decontaminable coatings that will be applied to floors walls and ceilings of the BMF.
The Structural Coatings Subcontract is a Firm Fixed Unit Price type of subcontract that is estimated to be in excess of $9M.
The BMF building is comprised of three main areas: the Mixed Oxide Processing Area (BMP), the Aqueous Polishing Area (BAP), and the Shipping and Receiving Area (BSR).
The majority of the rooms in these areas have exposed concrete floors, walls and ceilings.
The BMP contains 3 main floors with a basement area in the west end of the building.
It has 309 rooms, all but 7 or which receive decontaminable coatings.
The BAP contains 5 main floors.
It has 226 rooms which all receive decontaminable coatings.
The BSR contains 3 main floors with a partial basement for a cable spreading room under the ground floor.
Only 5 of its 79 room will receive decontaminable coatings.
Work areas will be released in stages as the building is constructed.
Several mobilizations and demobilizations may be required.
The RFP is scheduled for the end of the 3rd quarter FY 2008.
Proposals will be due in the 4th quarter FY 2008.
The award will be in the 1st quarter FY 2009.
Actual installation will not start until the 3nd quarter FY 2009 with completion by the 2nd quarter of FY 2012.
Description of the Work Specific The work scope inclu...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.