Contract · Federal · Small Business Set Aside - Total
AMENDMENT 002 - ODR Countertop & Cabinets Replacement
- Agency
- DEPT OF DEFENSE / DEPT OF THE AIR FORCE
- Location
- Aurora, CO
- Amount
- Amount not listed
- Posted
- Sep 10, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 236220 - Commercial and Institutional Building Construction look up NAICS codes
- PSC code
- Z2JZ - Maintenance, Repair, or Alteration of Real Property (general category)
Timeline
-
Posted
Sep 10, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $72K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- DEPT OF DEFENSE / DEPT OF THE AIR FORCE
- Location
- Aurora, CO
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 236220 - Commercial and Institutional Building Construction
- Scope
- Federal
AMENDMENT 002: Updated the Statement of Work (SOW), incorporated the pre-award RFI Q&A Log, added the AF Form 66 Submittal Schedule, and revised the RFP Volume I Technical Factors.
Additionally, the proposal due date is extended from 16 September 2026 to 17 September 2026.
These updates are reflected on the Request for Proposal (RFP) Amendment Two.
All other terms and conditions remain unchanged.
AMENDMENT 001: Updated Notice ID from FA254326Q0035 to FA254326R0012.
This update is also reflected on the Request for Proposal (RFP) V2.
All other terms and conditions remain unchanged.
The Buckley SFB Outdoor Recreation (ODR) facility (Bldg.
1022) is upgrading its reception area to improve service delivery and organizational workflow.
This project involves the complete demolition of the existing front desk and the single-phase installation of a new, ADA-compliant L-shaped front counter paired with a structured, three-tiered back-wall storage system.
The upgraded reception counter features a durable, seamless 100% acrylic surface with two 42-inch high caps and a 30-inch high accessible section, while the rear storage unit integrates lockable lower cabinets, a middle whiteboard layer, and open overhead shelving.
Additionally, the contractor will install two ski desks, route supporting electrical conduits, and complete necessary plumbing utility hookups without disruption to ongoing operations.
For additional details please reference the Statement of Work (SOW).
Site Visit: As prescribed in RFO 52.237-1, Site Visit, all prospective offerors are urged and expected to inspect the site where the work will be performed.
The site visit will be conducted on Tuesday, 01 September 2026 at 10:00 A.M.
Mountain Standard Time (MST) at BSFB.
We will meet at the Buckley SFB Outdoor Recreation Facility (Bldg.
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.