SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- Long Beach, NJ
- Amount
- Amount not listed
- Posted
- Sep 7, 2026
- Set-aside
- No Set aside used
- NAICS code
- 237990 - Other Heavy and Civil Engineering Construction look up NAICS codes
- PSC code
- Y1KF - Construction of Structures and Facilities (general category)
Timeline
-
Posted
Sep 7, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $55K-$1.4M
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- Long Beach, NJ
- Set-aside
- No Set aside used
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- Scope
- Federal
The US Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC), is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $35 million) within the Cape May To Lower Township, New Jersey, Brigantine Inlet To Great Egg Harbor Inlet (Absecon Island), New Jersey, And Barnegat Inlet To Little Egg, Inlet (Long Beach Island), New Jersey area.
This procurement is for Coastal Storm Risk Management (CSRM).
Cape May to Lower Township, NJ (Navigation Mitigation – Beachfill): Work for the beachfill placement dredging will require a hopper and pipeline/mechanical dredge(s).
The dredge(s) must have the capability to dredge material up to a depth of -40 ft NAVD88 and to transport the dredged sand to the designated areas approximately 2.6 miles away.
The project for navigation mitigation (beach nourishment) is located on the Atlantic coast of New Jersey, extending from the Cape May Inlet southwest jetty to the 3rd Ave terminal groin in Cape May City.
It includes the communities of the City of Cape May and Lower Township, and the US Coast Guard Training Center.
The contract work will consist of a base bid to conduct pre-placement condition surveys and pump/place 600,000 cubic yards of sand from two borrow areas approximately 2.6 miles south of the Cape May Inlet jetties onto the beach at 2 locations: Area 1 (540,000 cu yds), the US Coast Guard Training Center and Area 2 (60,000 cu yds), Wilmington Ave.
Options to place additional sand (100,000 cu yds) from the same borrow areas to achieve the full project design template at these same two beach locations will also be included.
Sand must come from the offshore borrow areas.
Trucking-in sand will not be permitted under this contrac...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.